For the multi-use stadium CSKA in Moscow, which is to be completed in 2015 after 8 years of construction works, our company delivered 280 modular air handling units. We were awarded the contract due to close cooperation of our technical experts with the design company from the very beginning of the project.
The exhaust and supply units have an air flow volume from 1000 m3/h up to 25000 m3/h. Beneath the water heater section most units feature a water cooler, a rotary recuperator and back-up fans, to ensure both energy efficiency and reliability of the system.
The total area of the stadium is 172.000 m2. It was designed for up to 30.000 visitors, there is also a separate parking space for 1.400 cars, a training complex, and a skyscraper hotel for athletes. Also planned is a CSKA museum, the club's souvenir shops, cafes and restaurants. Our ventilation equipment is implemented in all tribunes - west, north, east, and south and also in one of the high-rise buildings, that are part of the stadium complex.